Scope of Work
- Excavation and grading for over 9 km of pipeline routes
- Installation of HDPE and ductile iron water pipelines
- Construction of reinforced concrete valve chambers
- Civil and structural works for high-capacity pumping stations
- Coordination with local utility providers for seamless integration
- Full QA/QC documentation and pressure testing before handover
Key Achievements
- Delivered 2 weeks ahead of schedule
- Zero lost-time incidents (LTI)
- Optimized pipe-routing through advanced 3D modeling
- Achieved 100% operational compliance with DRC and MAF standards
- Trained junior engineers onsite under MSI’s knowledge transfer initiative
Technologies & Standards Applied
- Pipe installation under ASTM D3035 / EN 12201
- RCC structures designed to BS8110 + ACI 318
- Smart layout coordination with existing GIS utility maps
- SCADA-ready conduits for future control system integration